久久精品re,国产69精品久久久久9999,www.久久久久久久久久久,999精品免费视频,久久久久免费精品国产,国产精品热,国产精品九九

SAN-U News

The SAN-U Optronic Industrial Park Project has been crowned with great success

Jul 03, 2023

        On July 1, 2023, the SAN-U Optronics Industrial Park project located in Tongxianggao New City was successfully capped. SAN-U Optronic expanded its investment in Xiamen Torch High tech Zone and built a new SAN-U Optronic Industrial Park, marking a milestone in project construction.

        The total construction area of the SAN-U Optronics Industrial Park project is approximately 48000 square meters, including two factory buildings and one office complex building. The project will commence at the end of 2022, with a planned construction period of 24 months. The project plans to build 18 production lines. In addition to integrating existing production lines, it will also build a design and development center for 5G carrier network equipment optoelectronic devices, SiC (silicon carbide) series products above 1200V, sensing laser light sources, MEMS (micro electromechanical system) chip sealing and testing, as well as supporting infrastructure. This is of great significance for improving the overall layout of the semiconductor industry chain in our city.

        We will implement and transform the early research and development achievements and ongoing projects through key laboratories, pilot production lines, and fully intelligent production lines in the industrial park. According to Li Ling, Chairman of SAN-U Optronics, the new industrial park is beneficial for the company to integrate and upgrade its production layout, expand production capacity, and improve production efficiency. Among them, the intelligent production line of the industrial park will mass produce a series of new products, such as MEMS sensors for methane gas monitoring, semiconductor lasers for unmanned driving, drones, and other fields.

        It is worth noting that the SAN-U Optronics Industrial Park project only took 6 months from its start to its completion. Chairman Li Ling said that behind this, it is inseparable from the refined services of the Torch High tech Zone. From early project planning to bidding and construction management, the construction service team of Torch High tech Zone assisted us in promoting related work, and a series of services made us feel worry and effort free.

        Chairman Li Ling stated that SAN-U Optronics plans to gradually launch production line relocation work starting from the second quarter of next year. The company will seize the opportunity for cross island development, actively integrate into the city's high-tech industry layout, and strive to become the main supplier of sensors in China. The SAN-U Optronics Industrial Park project is located in the Tong'an area of Tongxiang High tech New City. The project is planned to invest over 250 million yuan and is expected to achieve an annual output value of over 2 billion yuan after reaching its capacity. The total construction area of the project is approximately 48000 square meters, mainly consisting of two factory buildings and one office complex building. The industrial park will build a production workshop that integrates its existing production capacity of optoelectronic devices and optoelectronic components applied in the fields of data transmission and communication, and establish a design and development center and supporting infrastructure for 5G carrier network equipment optoelectronic devices, SiC series products above 1200V, sensing laser light sources, MEMS chip sealing and testing, and other production lines.

Need Help? Chat with us

leave a message
For any request of information or technical support, fill in the form. All fields marked with an asterisk * are required.
Submit

Home

Products

whatsApp

contact

酉阳| 田阳县| 乌鲁木齐县| 临汾市| 金阳县| 万年县| 新田县| 汝南县| 无极县| 陵川县| 思茅市| 西贡区| 天长市| 宜君县| 台前县| 湖南省| 湄潭县| 浦东新区| 武强县| 清镇市| 南通市| 客服| 肇州县| 右玉县| 贡觉县| 洛宁县| 黄石市| 加查县| 广宁县| 伽师县| 拜城县| 安福县| 荃湾区| 张家川| 板桥市| 天津市| 南郑县| 青海省| 林甸县| 怀柔区| 壤塘县|